|
| |
Southern
New England Model Railroad Club
Permanent
Layout Construction Photos
Phase 4 Construction
 |
This 2x4
jungle is the vertical members of the framework that will hold the 2 1/2
turn helix at the end of the phase 4 portion of the layout |
| Here, Bob Jones is
assembling the spline roadbed on the lower level of the layout. The
spline roadbed is comprised of 6 pieces 1/2" x 1 1/4" plywood |
 |
 |
This is another view of the
location where the helix will be built. In the background Phil is
standing on the platform that is needed to operate the upper level of
the layout |
| The framework at the bottom
of the photo is for the platform that is required t operate the middle
level of the layout. |
 |
 |
Another view of the spline
roadbed being installed on the lower level |
| Another view of the 2x4
jungle. These frames will be for the lower and middle levels of the
mushroom style layout. |
 |
 |
More spline roadbed being
installed on the lower level. The middle level is easily visible above. |
| Bob Jones and his sidekick,
comic relief Phil Ginkus installing spline roadbed. |
 |
|